







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat does a tub-to-shower conversion cost in Miami, FL?
A tub-to-shower conversion in Miami runs $4,130 to $11,800 for the fixture and tile work, and a full conversion with permits, waterproofing, and a new pan typically lands inside our $10,620 to $33,040 bathroom remodel range. In a Miami condo or Brickell high-rise, add $500 to $1,500 in soft costs for HOA review and engineering sign-off, plus 2 to 4 weeks of approval time. Call (844) 797-4435 for a written, itemized price before any work starts.
Here’s the part most bids leave out: in a Miami multi-family building, a tub-to-shower conversion is a wet-area penetration event. The HOA’s architectural rules and the building’s original waterproofing membrane both have approval rights, and a failed shower pan doesn’t just ruin your tile. It becomes a water-intrusion claim against the unit below. A realistic, complete number accounts for that, and so does our written scope.

Why the online “average conversion cost” you found doesn’t survive a Miami building
National cost guides assume a single-family house where you can cut into a wood subfloor and call it a day. Miami’s housing stock doesn’t cooperate.
Downtown and Brickell are dominated by post-2000 high-rises and infill townhomes. West Miami and Westchester are post-war CBS ranches, concrete block and stucco. Miami Beach and Little Havana carry 1920s Mediterranean-revival and Art Deco masonry. Three different structural vocabularies, each with its own tie-down, waterproofing, and envelope demands. A conversion priced off a mainland template ignores all three, and the gap shows up once the crew opens the wall.
A few other things specific to Miami drive the number up or down:
- Flood zone elevation. In Miami Beach and parts of Little Havana, many homes sit in the FEMA AE flood zone, so a renovation scope can require elevating electrical and mechanical components above base flood elevation. That’s a permit-driven line item, not a surprise.
- HVHZ product approval. Miami-Dade’s High Velocity Hurricane Zone code is the strictest wind-load and product-approval regime in the country. Even interior work forces you to confirm product approvals and use corrosion-resistant fasteners rated for salt air and year-round humidity.
- Humidity and grout-line movement. Subtropical moisture and daily shower cycles are why shower pan failures and grout breaches are the most common callback on conversions here. The waterproofing spec matters more than the tile you pick.
The three approval layers inside a Miami-Dade condo conversion
Before a single tile comes down in a multi-family unit, a conversion usually needs three separate sign-offs, and they don’t run at the same time:
- A Miami-Dade building permit for the plumbing and structural work.
- The HOA or condo association’s written architectural approval, which can dictate hours, elevator use, debris removal, and what fastener types you’re allowed to use on shared walls.
- In many Brickell high-rises, an engineer’s review of the drain relocation before anyone touches the slab.
That stack adds 2 to 4 weeks and $500 to $1,500 before the first fixture ships. Our written upfront pricing bakes the permit fee into the quote instead of billing it later, so the number you approve is the number you pay. Every Bradford Remodeling Co Miami conversion also carries the Garrison Standard: a written price and a written guarantee in hand before work begins.

Drain relocation is the single most underquoted line item in a conversion bid
Moving a shower drain even 12 inches in a Miami concrete slab is real work. Slabs here run 4 to 6 inches thick with rebar density that varies by era, so the drain move means core drilling, saw cutting, and re-sleeving the drain line. In Miami that runs $800 to $1,400, and it’s the line most bids quietly skip.
Our written scope names the drain hardware specification, the waterproofing membrane by product, and the Kohler or Moen fixture SKU, so you can check every material against its manufacturer data sheet before the crew arrives. Background-checked, uniformed technicians show up on schedule, and a live person answers the phone 24/7, not a voicemail queue.
Tub-to-shower conversion cost breakdown, Miami
| Line item | Typical range |
|---|---|
| Tub-to-shower conversion (fixture and tile) | $4,130-$11,800 |
| Walk-in shower installation | $5,310-$14,160 |
| Shower replacement | $3,540-$10,030 |
| Bathroom vanity installation | $945-$3,540 |
| Full bathroom remodel (conversion complete) | $10,620-$33,040 |
| Small bathroom remodel | $5,900-$14,160 |
For the wider scope, including layout changes or a second bath, see our Bathroom Remodeling in Miami work.
What a complete written scope covers for a Miami conversion
You should be able to read your quote and confirm every material against a datasheet. Ours itemizes:
- Permit fee and HOA and engineer review costs, stated up front.
- Waterproofing membrane, named by product, applied to a substrate spec’d for your wall type.
- Fixture brand and SKU, e.g. Kohler or Moen, with the finish and cartridge listed.
- Drain hardware and re-sleeve specification.
- Tile selection and grout spec.
- Cleanup and the close-out package: signed written guarantee and documented scope in your hand.
Why the waterproofing spec is where Miami conversions fail inspection
In CBS ranch homes across West Miami and Westchester, the tub surround often conceals original single-wythe block with no cavity behind it. Standard cement board alone won’t pass a Miami-Dade wet-area inspection there. The block face needs a compatible masonry membrane applied directly before any new tile substrate, and that’s a spec, not a preference. The same rule applies whether the walls hide KraftMaid cabinetry or original 1960s tile. A contractor who hasn’t built conversions in this housing stock won’t know to check for it until the wall is open.
Our technicians have up to 22 years of experience working in Miami’s three structural vocabularies, and every conversion is covered by the 365-Day Done Right Promise: if shower pan failures or grout-line breaches show up inside the first year, we come back and correct them at no charge. When comparing bids, ask each contractor to define exactly what counts as a covered failure and how fast they respond. That answer separates a real guarantee from a line on a flyer.
FAQs
A conversion in Miami typically runs $4,130 to $11,800 for the fixture and tile work, and a full conversion inside a complete bathroom remodel lands at $10,620 to $33,040. In a condo, add $500 to $1,500 in HOA and engineering soft costs. Call (844) 797-4435 for an exact written quote, and estimates are free.
Yes. A multi-family unit conversion generally requires a Miami-Dade building permit, your HOA or association’s written architectural approval, and in many Brickell high-rises an engineer’s review of the drain relocation before the slab is opened. Those three sign-offs add 2 to 4 weeks. Call (844) 797-4435 and we’ll walk you through what your building needs.
Repair is often cheaper short term, but a tile or waterproofing failure usually returns within a season in Miami’s humidity, and a failed shower pan can damage the unit below. When the surround is already failing, a conversion with a proper membrane costs less over time than repeat patching. Call (844) 797-4435 to weigh the two against your written numbers.
Yes. Our written scope bundles the permit fee and includes the HOA approval and engineering review in the upfront price, so nothing reappears at the door. A live person answers the phone 24/7 if your building manager raises a question mid-project. Call (844) 797-4435 for a free estimate.
If you’re ready to square away a conversion in Miami, call (844) 797-4435 and we’ll give you a written price and a written guarantee before a single tool comes out. Every completed conversion is covered by the 365-Day Done Right Promise.
Written by the team at Bradford Remodeling Co Miami, serving Miami, FL.
What Our Customers Say
"Home remodel with a new floor plan. Handled structural work and permits without drama."
- Gus R."Kitchen remodel run by a veteran-owned crew. They started on the day promised, kept the site clean, and gave weekly updates. New cabinets and counters look great."
- Alan M."Replaced old windows and trim while redoing the kitchen. Clean finish work."
- Ron F.












