How Long Does Kitchen Remodeling Take? Timelines and What to Expect

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Miami

Last updated November 18, 2026

New painted shaker cabinets with an organized deep drawer
A small remodeled galley kitchen with cabinets to the ceiling
A walk-in pantry with wood shelving
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A whole-home remodel with the living, dining and kitchen areas opened up
A second-story addition that matches the existing roofline
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

How Long Does Kitchen Remodeling Take? Timelines and What to Expect

The most common reason a six-week kitchen remodel stretches to fourteen weeks isn’t the contractor. It’s cabinets that were ordered after demo started – a sequence error that costs exactly four to six weeks every single time. We’ve watched homeowners in Miami lose a month and a half of schedule not because anyone swung a hammer slowly, but because a purchase order went out on the wrong day. The timeline of a kitchen remodel is mostly decided before demolition. It’s set by permit lead times, material lead times, and the order the trades are scheduled. This guide breaks down every hard phase, the Miami-Dade permit realities most guides skip, and the exact sequence logic that separates a smooth job from a stalled one.

Call (844) 797-4435

Quick Answer

A cosmetic kitchen remodel in Miami takes about 3 to 5 weeks. A mid-scope remodel with new cabinets and countertops runs 6 to 10 weeks. A full gut remodel with moved plumbing and electrical runs 10 to 16 weeks, and sometimes longer. Two factors decide whether you land at the short or long end: when permits are pulled relative to demolition, and when cabinets are ordered relative to the schedule.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Table of Contents

The Six Hard Phases of a Kitchen Remodel

Every kitchen remodel, in Miami or anywhere else, moves through six phases in a fixed order. You can compress each one. You can overlap a few of them carefully. But you can’t skip the order. Here’s what each phase covers and how long it actually takes on a residential kitchen.

  1. Demolition (2 to 4 days). Cabinets, countertops, old flooring, and any wall coverings come out. A crew that knows what it’s doing protects the floors first and hauls debris daily. If the scope includes wall removal, demo runs longer because the framing has to be opened for inspection.
  2. Rough-in (4 to 8 days). Plumbing and electrical go in the walls before drywall closes them up. Rough-in means the pipes and wires that will be hidden once the walls are sealed. If you’re moving the sink or adding a range hood, this is where that decision gets built. HVAC work for a new vent or duct relocation happens here too.
  3. Inspection hold (3 to 10 days in Miami-Dade). The rough-in has to pass inspection before the walls close. This hold isn’t a contractor dawdling – it’s the building department’s schedule, and it’s the phase homeowners are least prepared for. We’ll come back to Miami-Dade specifics below.
  4. Drywall, paint, and flooring (5 to 8 days). Substrate goes up, meaning the flat underlayer that cabinets and tile sit on. Tape, mud, sand, prime, and paint. Flooring goes down once the walls are clean.
  5. Cabinet installation (2 to 5 days). An installer who knows the layout sets base cabinets, uppers, and any island. Simple kitchens install fast. A complicated island with a waterfall edge or a range of custom sizes takes longer. Once cabinets are level and secure, the countertop templating clock starts.
  6. Countertops and final finish (7 to 14 days). This is the phase that swallows schedules, because countertops can’t be templated until cabinets are set. Templating means a technician measures the exact cabinet run, then the slab gets cut to fit. Cambria and Caesarstone both need fabrication time between template and install. Then plumbing reconnects, the final electrical gets trimmed out, appliances slide in, and you get a punch-list walkthrough.

Add those up honestly and you see where the weeks go. On a full gut job, phases four and six run longer than most homeowners expect because finishes and fabrication are the slowest links. When we quote a kitchen in Miami, the phase dates are written down, not estimated over the phone.

Why Every Phase Must Finish Before the Next Starts

The reason kitchen timelines go sideways is almost never a slow trade. It’s trades showing up out of order. Cabinets can’t be set until the substrate is flat and painted. Countertops can’t be templated until cabinets are set. The sink can’t reconnect until the counter is in. The backsplash can’t start until the countertop is secure. Each step waits on the one before it, and a single missed handoff cascades through all of them.

Think of the sequence as a chain, not a queue. If the cabinet delivery slips two weeks, you don’t just lose two weeks. You lose two weeks plus any template window that got missed plus any fab slot the countertop shop released because you weren’t ready. That’s how a two-week delay turns into six weeks. Most of what homeowners experience as a mysterious stall comes down to one missed handoff.

That’s why kitchen remodeling in Miami and anywhere else depends on an honest schedule handed over at the start. The contractor’s job isn’t just to build – it’s to hold the sequence. Holding the sequence means the electrician is scheduled on the day the walls are open, the inspection is booked the day the rough-in is done, and the cabinet order was placed weeks before anybody touched a wall. It also means the crew knows what the next phase is before the current one ends. When a schedule is honest about the handoffs, the dates on paper and the dates on your calendar actually match.

Miami-Dade Permit Lead Times

Pulling permits before demo, not after, is the single biggest schedule lever on a kitchen remodel. It sounds backwards – you’d think permits follow demolition. They don’t. The permit has to be issued before demolition, because the work itself is what the permit authorizes. Cabinets don’t get pulled, but plumbing and electrical do, and those permits usually have to be final before you can start tearing anything out.

In Miami-Dade, plan review on a kitchen remodel with plumbing or electrical changes typically runs 3 to 6 weeks for a standard residential scope. Simple cosmetic work that doesn’t move plumbing may clear faster. Projects that touch load-bearing walls or change the footprint always run longer. A permit that’s pulled on day one means demo can start the day the permit is in hand. A permit that’s pulled after demo means the whole job sits idle while the building department catches up.

We’ve seen homeowners in Coral Gables and Pinecrest lose four weeks on a permit they pulled late because the contractor started tearing out cabinets before the paperwork cleared. The cabinets were fine. The permit was the problem. If you’re remodeling in Miami, plan for permit lead time as a real part of the schedule and you’ll save the weeks you would have otherwise watched disappear.

The Cabinet Order Trap

Here’s the sequence math most people miss. Cabinets have a lead time. Cabinet lead time is the time between when the order is placed and when the boxes land at your house. For KraftMaid and Wellborn cabinetry, that window is typically 4 to 8 weeks depending on the door style, finish, and customization. Then cabinets have to be installed. Then countertops get templated. Then countertops get fabricated and installed. Anyone who orders cabinets the day demo starts has already lost the race.

The countertop angle makes this worse. A two-week delivery delay on cabinets isn’t a two-week problem. It’s a two-week delay plus however much time the countertop shop needs to re-queue your templating slot. If your cabinets arrive late and the shop has already scheduled someone else in your spot, you’re now looking at four to six weeks instead of two. That’s the trap.

Here’s how to avoid it, in order:

  1. Finalize the cabinet layout and place the order before demo begins.
  2. Confirm the delivery date in writing, and build the schedule around it.
  3. Template countertops the week cabinets are installed, with the fabrication slot already booked.
  4. Order appliances and fixtures on the same timeline as cabinets, so nothing sits on the floor waiting.

A documented material roster matters here, because you need to know exactly what’s coming and when. That’s why we work from named brands – KraftMaid and Wellborn for cabinetry, Cambria and Caesarstone for surfaces – so the spec is traceable and the lead time is predictable instead of a guess.

Realistic Day Counts by Scope

Numbers matter more than adjectives. Here’s what we see for kitchen scope across Miami neighborhoods, from a cosmetic refresh to a full gut. Day counts assume permits are pulled before demo and materials are ordered on schedule. Slip either and you’re in the long end of the range or beyond.

Cosmetic (paint, cabinet refacing, new backsplash, new hardware): 15 to 25 working days

No plumbing or electrical moves. Cabinet boxes stay, doors and fronts get replaced. Backsplash comes out and goes back in. Usually no permit needed and no inspection hold. This range fits most Miami condos and homes where the layout already works.

Mid-scope (new cabinets, new countertops, some electrical): 30 to 50 working days

The adds here are the cabinet lead time and the countertop fabrication window. Electrical gets updated, fixtures get replaced, but plumbing lines stay put. This is the most common kitchen scope we see in Miami, and it’s where the sequence discipline pays off most.

Full gut (layout changes, moved plumbing, new flooring, new appliances, structural work): 50 to 80 working days

Now you add wall opening, framing, rough-in, a longer inspection hold, drywall, flooring, and a full material install. If load-bearing walls are being removed, add a structural review and longer plan review. If the home is in a condo building, add HOA review time before demolition even starts.

What moves each number

  • Permit timing. Pulled before demo: no lost weeks. Pulled after: 3 to 6 weeks lost.
  • Cabinet lead time. Standard finish: 4 to 6 weeks. Custom or specialty: 8 weeks or more.
  • Countertop fabrication. Cambria and Caesarstone fabrication windows run a few weeks after templating.
  • Inspection schedule. Miami-Dade inspection holds run 3 to 10 days depending on the workload.
  • Scope creep. Any decision made mid-job adds time because it reopens a phase already closed.

If your project spans more than one room, the same logic scales up. Whole-home remodeling in Miami uses identical sequencing rules, just with more trades sharing the calendar. For a room-specific comparison, our guide to bathroom remodeling in Miami covers the smaller-project version of this timeline.

What a Written Project Schedule Should Look Like

A real project schedule is not a three-line estimate scribbled on a quote. It’s a page with dates, not ranges, and every phase mapped against the trades that touch it. Here’s what it should include:

  • Phase start and end dates. Not “week of.” Actual dates.
  • Permit milestone. When the permit is submitted, when it’s expected back, and who is following it up.
  • Material order dates. Cabinet order date, appliance order date, countertop template date. Written down.
  • Inspection dates. When rough-in is inspected, when the final is scheduled.
  • Trade handoffs. Which trade is on site each day and what they’re doing.
  • Buffer. A schedule with zero slack built in is a schedule that will break.

Holding the sequence means the contractor owns those dates and owns the handoffs between them. If the electrician is late, that’s the contractor’s problem, not yours. When a schedule is in writing, you have something to point at when a date slips, and so does the contractor. That’s the difference between a disciplined job and an open-ended one.

Bradford Remodeling operates under a licensed general contractor in Miami and runs every project under The Garrison Standard – every price and every guarantee written down before the first tool comes out. Our technicians have up to 22 years of experience, which is why the sequencing on our schedules matches what actually happens in the field. We use a documented material roster across KraftMaid, Wellborn, Cambria, Kolher, and other specified brands, so lead times are predictable rather than a surprise.

Common Mistakes to Avoid

  • Ordering cabinets after demo starts. This is the four-to-six-week mistake that ruins every timeline. Order cabinets before demo, and the schedule holds.
  • Pulling permits after demolition. Homeowners think permits come after demo. They don’t. In Miami-Dade, pulling late adds 3 to 6 weeks to the schedule for no reason.
  • Choosing countertops after cabinets are installed. The slab has to be selected before templating, not after. Cambria and Caesarstone both need lead time for fabrication, and the shop slots are booked weeks out.
  • Not allowing for condo or HOA review. Miami condos often need board approval before demolition, and that can add a week or two on its own. Plan for it up front.
  • Ignoring the inspection hold. Rough-in inspections in Miami-Dade run 3 to 10 days, and you can’t skip past them. Build the hold into the schedule instead of acting surprised when it lands.
  • Making finish decisions mid-job. A change order placed on day 20 of a 40-day job reopens phases that were already closed. Every decision that lands late costs time and, often, money.
  • Accepting a verbal schedule. If it’s not written down with dates, nobody is accountable for it. A verbal schedule isn’t a schedule.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

When to Call a Professional

A cosmetic refresh – painting, hardware, backsplash – is doable by a careful homeowner in Miami. A full gut kitchen remodel with moved plumbing, electrical rough-in, load-bearing wall changes, or structural work is a different job. The permit-and-inspection part alone requires a licensed contractor, and the sequencing gets complicated fast. If your plan involves moving a gas line, opening a wall, or relocating the sink, those are the moments where a pro earns the fee. If you’re not sure whether your scope is mid-tier or full gut, that’s the right time to get a walkthrough. Bradford Remodeling Co Miami offers free estimates in Miami – call (844) 797-4435 to schedule yours.

Frequently Asked Questions

The Bottom Line

Installers leveling a new base cabinet during a kitchen remodel

Kitchen timelines aren’t decided by how fast a crew works. They’re decided by whether permits are pulled before demo, cabinets are ordered before demo, and the trades are scheduled in the right order. Get those three right and a Miami remodel lands in its expected range: 3 to 5 weeks cosmetic, 6 to 10 weeks mid-scope, 10 to 16 weeks full gut. Get them wrong and you’ll watch a six-week job turn into fourteen. The schedule is the job. Every Bradford Remodeling project comes with a written price before work begins, a documented material roster, and the 365-Day Done Right Promise standing behind every finished kitchen. To start your kitchen project in Miami, call (844) 797-4435 for a free estimate and a written schedule. You can learn more about our Bradford Remodeling Co Miami home page and our full range of services there.

Written by the team at Bradford Remodeling Co Miami.

Getting started with Bradford in Miami

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Miami team

A local vetted partner works across Miami and the towns around it, to the same written standard as every Bradford job.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Miami? Licensed & insured · free written estimates
Call (844) 797-4435
Local Service Coverage

Request a Free Estimate in Miami

Tell us what you need - Bradford Remodeling Co Miami responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch